Vemly

Demo building and renovation website. Fictional business, sample content.

I want one like this
A white courtyard house at dusk: a long pool runs between a covered dining terrace and an open, lit living room

Built to the drawing. Finished on the date. At the price we signed.

Houses, villa renovations and pools around Hua Hin. One licensed engineer, our own crews, and a quote you can read line by line.

Where we build
Hua Hin, Cha-am, Pranburi
Contract
Fixed price, itemised line by line
Payment
Seven stages, each after inspection
Guarantee
10 years on the structure

Nine we have handed over

Each with its real size, time on site and budget. Open one to see what we did and how.

Showing 9 projects.

  • Yours next?Tell us what you want to build. We visit the site within five working days, at no charge.Request a quote

Month four, and month eight

Drag the handle, or use the arrow keys. What you pay for in the first half of a build is mostly what you will never see again.

A finished two-storey house with timber cladding, tall windows, a stone ground floor and a carport
A two-storey concrete house during construction: bare grey frame, windows fitted, a pile of sand in front

During: frame, slabs and blockwork complete, windows in, render still to come. After: a finished two-storey house of the same layout. These are two different builds, shown together to compare the stages.

What we build

Five kinds of work, all with our own crews. Prices are starting rates for a standard finish, materials and labour included.

  • Corner of a timber-clad two-storey house with palms and a stone wall

    New houses

    From bare land to keys. Soil test, structural drawings signed by a licensed engineer, building permit, concrete frame, roof, all services and finishes. One contract, one site engineer, one price.

    Price
    From 19,000 baht per m²
    On site
    7 to 12 months
  • Renovated two-storey villa with timber eaves behind a pool terrace

    Villa renovations

    Leaking roofs, cracked render, tired wiring, dark layouts. We survey first, tell you what is structural and what is cosmetic, and price each part separately so you can choose what to do now and what can wait.

    Price
    From 7,500 baht per m²
    On site
    2 to 6 months
  • Long green stone lap pool beside a white house and palms

    Swimming pools

    Reinforced concrete shells, never liner on blockwork. Skimmer or overflow, stone or mosaic, salt or chlorine. Every pool is filled and watched for seven days before a single tile goes on.

    Price
    From 21,000 baht per m² of water
    On site
    9 to 15 weeks
  • Kitchen in walnut and dark grey with an island, two stools and glass pendants

    Kitchens

    Cabinets built by our joinery partner in Pranburi on moisture-resistant board, fitted by our own carpenters. We move the plumbing, add the circuits and vent the hood outside, not into the ceiling.

    Price
    From 22,000 baht per m²
    On site
    4 to 8 weeks
  • Bathroom with patterned floor tiles, a freestanding bath behind glass and a stone vanity

    Bathrooms

    Stripped to the slab, new falls, two coats of membrane and a 48-hour flood test. Then tiles, glass and fittings. The part you never see is the part that stops the leak downstairs.

    Price
    From 24,000 baht per m²
    On site
    3 to 6 weeks

What will it cost, roughly?

Three choices and you have a range in baht, based on what our last forty jobs actually cost.

What are you planning?
180 m²
Finish level

Insulated roof, large-format porcelain, wide sliding doors with screens, built-in wardrobes, heat-pump hot water.

Rough cost, all labour and materials

4.7 to 5.9 million baht

Where it goes, from the ground up

  1. Design, permit and site280,000 to 360,000
  2. Foundations and structure1.4 to 1.8 million
  3. Roof470,000 to 590,000
  4. Walls, doors and windows840,000 to 1.1 million
  5. Plumbing and electrics660,000 to 830,000
  6. Finishes and joinery1 to 1.3 million
Rate used
26,000 to 33,000 baht per m²
Typical duration
8 to 10 months on site

This is an indication, not a quote. Ground conditions, access, the state of an existing building and your choice of materials all move the price. A real quote needs a site visit: it is free and takes about an hour.

Watch one get built, and see when you pay

A new house, from the first site visit to the check a year after handover. You pay for each stage after you have walked it with the engineer, never before. Renovations and pools follow the same order with fewer steps.

14.00 m7.00 mPermit approvedHua Hin municipality6.58 m
The finished house: timber cladding, tall glazing and a stone-clad ground floor, seen from the garden corner
  1. Site visit

    Within 5 working days

    The site engineer walks the plot or the house with you, measures, photographs and asks about budget. About an hour.

    Free

  2. Drawings and itemised quote

    2 to 3 weeks

    Layout, structural drawings and a bill of quantities: every material with brand, quantity and unit price. You can compare it line by line with anyone else's.

    35,000 baht, deducted if you build with us

  3. Contract and permit

    2 to 6 weeks

    Fixed-price contract in Thai and English with a start date, a handover date and a penalty of 0.05% a day if we are late. We file the building permit.

    10%on signing

  4. Foundations and ground slab

    Weeks 1 to 6

    Piles or footings, ground beams, termite pipework, slab. You get photos of the steel before every pour.

    20%when the slab is cast and inspected

  5. Structure and roof

    Weeks 7 to 16

    Columns, beams, upper floors and stairs, then the roof frame, insulation and covering. The house is dry.

    20%when the roof is on

  6. Walls, windows, pipes and cables

    Weeks 17 to 24

    Blockwork and render, aluminium doors and windows, all plumbing pressure-tested and wiring pulled before any wall is closed.

    20%after the pressure test

  7. Finishes

    Weeks 25 to 34

    Tiles, ceilings, paint, joinery, sanitary ware, lights, kitchen. A weekly walk-round with the foreman.

    15%when finishes are complete

  8. Handover

    On the contract date

    We walk every room together with a snag list. Keys, as-built drawings, warranties and manuals in one folder.

    10%when the snag list is cleared

  9. Twelve-month check

    One year later

    We come back after a full rainy season, fix anything that has moved or leaked, and only then ask for the last payment.

    5%held back for a year

The contract price, in seven paymentsPaid so far 100%
  1. 10%Contract
  2. 20%Foundations
  3. 20%Structure, roof
  4. 20%Walls, services
  5. 15%Finishes
  6. 10%Handover
  7. 5%Year-one check

What we guarantee, in years

Written into the contract, not into a brochure. Call us about a defect and someone is at your door within 48 hours.

  • 10 years

    Structure

    Foundations, columns, beams and floor slabs. Any structural crack or settlement, repaired at our cost.

  • 5 years

    Roof and waterproofing

    Roof covering, flat-roof membranes and wet-room waterproofing. If water comes through, we open it up and redo it.

  • 5 years

    Pool shell

    No loss of water through the concrete shell. Pumps and filters carry the maker's 2-year warranty.

  • 2 years

    Plumbing and electrics

    Pipes, drains, wiring, breakers and everything we installed behind the walls.

  • 1 year

    Finishes

    Tiles, paint, doors, joinery and sealants. Checked and put right at the twelve-month visit.

Not covered: damage from alterations by others, normal wear, and hairline shrinkage cracks in render under 0.3 mm, which we fill and repaint once at the twelve-month visit anyway.

Twenty-four people on the payroll

Started in 2011 by a site engineer from Hua Hin and his sister, who still runs the accounts and answers the phone. We do not hand your job to whichever crew is free that week. Only aluminium windows, air conditioning and built-in furniture are subcontracted, to the same three firms every time.

  • Hands drawing on an architectural plan with a pencil and a scale rule

    Engineer and drawings

    One licensed civil engineer signs the structure and visits every site twice a week. Two draughtsmen turn your sketch into permit drawings.

  • A column cage of steel reinforcement bars seen from below against the sky

    Concrete and steel

    Nine masons and steel fixers in two crews, each under a foreman who has been with us more than eight years. Ready-mix concrete only, with a cube test on every structural pour.

  • A tiler in a straw hat spreading adhesive on a terracotta floor with a trowel

    Tiling and waterproofing

    Three tilers who do nothing else. Large-format porcelain, pool mosaic and stone, laid on full adhesive beds with levelling clips.

  • Close view of hands loading plaster onto a steel trowel

    Render, paint and joinery

    Two plasterers, two painters and two carpenters. Built-in furniture comes from a joinery workshop in Pranburi we have used since 2014.

Request a quote

Tell us what and where. We call back within one working day, visit the site within five, and send an itemised quote two to three weeks after that.

Office and sample room
88/14 Soi Hua Hin 102, Nong Kae
Hua Hin, Prachuap Khiri Khan 77110
LINE
@lekfaibuilders
Hours
Monday to Saturday, eight in the morning to five in the afternoon. Closed on Sundays and on public holidays. Site visits by appointment, including early evenings. We speak Thai and English.

We reply within one working day. The site visit and the quote are free.